We have 2 standard charge controllers:   100A (1200W) MPPT Has a screen with battery voltage, parameters, etc.  Max input solar voltage is 23V Not waterproof  Works with SLA, lead acid, AGM, Lithium Iron Phosphate, LiFePO4  20A (260W) MPPT LED indicators, no screen. A remote can be purchased separately that will show all parameters as well as voltage, etc.  Max input solar voltage 72V 100% waterproof Works with SLA, lead acid, AGM, Lithium Iron Phosphate, LiFePO4, as well as our Cutting Edge Power Lithium Nickel Cobalt high performance Lithium ion batteries.  The Trailblazer, Scout and Base model solar generators are equipped with the 100A MPPT charge controller as standard.  The Fortress solar generator...

Leer más

Leer más

A customer recently asked: I am looking for solar (and possibly combined with wind) generator when we go camping for up to 2 weeks. We use a Jumping Jack pop up tent trailer so it's not like we are walking the setup into the campsite. It would be used to power 2 Phillip's CPAP machines, a small fan, some LED lights, cell phones, and Bluetooth speaker or rechargeable batteries.  What system/combination of products do you all recommend to accomplish this task? Cutting Edge Power: Camping is one of my favorite pastimes. Some of my best childhood memories are from camping at...

Leer más

This is how Cutting Edge Power recommends to set up a basic solar system. Check list: The Solar panel, charge controller, battery, inverter, and wiring connection. SET UP: Follow these 3 easy steps: The battery should be hooked up to the charge controller first. Otherwise, the charge controller can be damaged. Make sure to follow NEC guidelines regarding wire sizes (See the table at the end for details.) Make sure that you lead the wire into the battery terminal of the charge controller and match the + and – to the battery + and -. We recommend using wire ferrules ...

Leer más

There are many ways to backfeed power to the grid, especially with renewable energy. You are correct that in some cases it can be dangerous and illegal. Since this technology is fairly new, the industry is lacking certain codes and certifications that would otherwise need to be in place. For example, with computers there are various UL and ETL certifications that computers must pass before customers will accept them. That doesn’t mean federal law requires those certifications. It’s based on consumer demand. Since our industry is so new, the consumer demand is still developing, along with codes and certifications. So although we...

Leer más