Current Lead Times

To our valued customers,

 

Please note the current lead times for our items below.  These lead times are a result of insisting on the best quality parts and the best build quality for our customers.  Parts and build quality are quickly rejected if they don’t meet our standards.  While we assemble all of our brand's products in the USA and we try to use as many domestic parts as possible, some of our parts are only available overseas and can affect our lead times.  

 

NOTE: There is an expedite option available during checkout. The expedite option will reduce lead time by half. 

 

While we always strive to ship earlier, we prefer to post conservative estimates so there are no disappointing surprises.  Please keep in mind, we’re doing our best to produce the highest quality product for our customers. 

 

Lead times [Updated: 09/11/2020]

Item(s)

Lead time to ship

(handling time from the date the order was placed)

Mini Wind Turbines, Assembled in USA

1 week

Smart Turbines, Smart Tech Power Meter, Assembled in USA

2-3 weeks

Cutting Edge Power Industrial Strength items (Steel solar panel mounts, wind turbine bases, etc.), Welded in USA from USA steel

3-4 weeks

Solar Generator Battery Boxes, Assembled in USA, charge controllers and other products assembled in USA

3-4 weeks

Small items (replacement items, spare components, 12V Wind Turbine Charge Controller, PWM 120W Charge Controller,  MC4 USB Adapter, Generators, etc.)

1 week