yandex

Current Lead Times

To our valued customers,

These lead times are a result of insisting on the best quality parts and the best build quality for our customers.  Parts and build quality are quickly rejected if they don’t meet our standards.  While we assemble products in Texas, USA and we try to use as many domestic parts as possible, some of our parts are only available overseas and can affect our lead times.  We always strive to ship earlier, but we prefer to post conservative estimates so there are no disappointing surprises. 

NOTE: There is an expedite option available during checkout. The expedite option will reduce lead time by half.  

Lead times

Updated 11/15/2020

Item(s)

Lead time to ship

(handling time from the date the order was placed)

Mini Wind Turbines, Assembled in USA

1 week

Smart Turbines, Smart Tech Power Meter, Assembled in USA

2-3 weeks

Cutting Edge Power Industrial Strength items (Steel solar panel mounts, wind turbine bases, etc.), Welded in USA from USA steel

2-3 weeks

Solar Generator Battery Boxes, Assembled in USA, charge controllers and other products assembled in USA

1-3 weeks

Small items (replacement items, spare components, 12V Wind Turbine Charge Controller, PWM 120W Charge Controller,  MC4 USB Adapter, Generators, etc.)

1 week

High performance lithium batteries, assembled in USA 1-3 weeks